...
首页> 外文期刊>Automation in construction >Analysis of information integration benefit drivers and implementation hindrances
【24h】

Analysis of information integration benefit drivers and implementation hindrances

机译:信息集成的利益驱动因素和实施障碍分析

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents an analysis of benefits and hindrances for specific information integration implementa-tions in the industrial construction sector. A tool, developed by a Construction Industry Institute research team, detailed 37 benefit drivers and 34 hindrances that affect information integration implementation ef-forts. The tool was applied to 16 test cases. Scores from the cases allow analysis of the importance and con-sistency of factors. Findings reveal that benefit drivers have a certain degree of consistency, particularly around justification to enhance work process benefits rather than broader benefits to project outcomes. On the other hand, there is a much wider range of important implementation hindrances. These findings suggest that each implementation requires a customized approach to address hindrances rather than reliance on ge-neric methods. More broadly, the set of specific benefit drivers and hindrances extends and generalizes the literature on information integration implementation in construction, particularly with respect to the indus-trial sector. Published by Elsevier B.V.
机译:本文对工业建筑行业中特定信息集成实施的利弊进行了分析。由建筑工业协会研究小组开发的一种工具,详细介绍了37个利益驱动因素和34个影响信息集成实施工作的障碍。该工具已应用于16个测试用例。通过案例评分可以分析因素的重要性和一致性。研究结果表明,利益驱动因素具有一定程度的一致性,尤其是围绕提高工作流程利益的理由,而不是为项目成果带来更广泛的利益。另一方面,存在重要实施障碍的范围要广得多。这些发现表明,每个实现都需要一种定制的方法来解决障碍,而不是依赖于通用方法。从更广泛的意义上讲,一系列具体的利益驱动因素和障碍扩大并概括了有关建筑中信息集成实施的文献,特别是在工业领域。由Elsevier B.V.发布

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号