PROJECT MANAGEMENT EFFECTIVENESS: THE CHOICE - FORMAL OR INFORMAL CONTROLS

机译:项目管理的有效性:选择-正式或非正式控制

获取原文
获取原文并翻译 | 示例
           

摘要

Development failures and runaway projects in the information systems (IS) area can result in substantial losses to organizations, either financially or to a company's reputation. One important strategy in mitigating risk is the use of effective controls over IS projects. This research investigates the effectiveness of control mechanisms in IS projects, i.e., how they have been established, applied, and how they have evolved throughout the project. We conducted an in-depth study of six information systems projects with six different project managers. We found that formal controls were adopted on project elements with clearly defined project outcomes and informal controls were adopted mainly on project elements that were unclear and often related to people. Furthermore, formal controls were dominant at project initiation and in most cases these controls became less dominant over the project duration. These formal controls were more rigorously applied in external IS projects while informal controls increased in importance throughout the project duration in internally developed projects. We found the existence of informal controls to be very important in helping ensure successful project outcomes.
机译:信息系统(IS)领域中的开发失败和失控项目可能导致组织在财务上或公司声誉方面遭受重大损失。减轻风险的一项重要策略是对IS项目进行有效控制。这项研究调查了IS项目中控制机制的有效性,即控制机制如何建立,应用以及在整个项目中如何发展。我们与六个不同的项目经理对六个信息系统项目进行了深入研究。我们发现,对具有明确定义的项目成果的项目要素采用了正式控制,而对不清楚且经常与人相关的项目要素采用了非正式控制。此外,正式的控制在项目启动时占主导地位,在大多数情况下,这些控制在项目持续时间内变得不那么占主导地位。这些正式控制在外部IS项目中得到了更严格的应用,而非正式控制在内部开发项目的整个项目期间都变得越来越重要。我们发现非正式控制的存在对于帮助确保成功的项目成果非常重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号