Performance-Based Pay Factors for Asphalt Concrete Construction; Comparison with a Currently Used Experience-Based Approach

机译:沥青混凝土施工中基于性能的报酬因素;与当前使用的基于经验的方法的比较

获取原文
获取原文并翻译 | 示例
           

摘要

The paper briefly summarizes a procedure to quantitatively establish pay factors for asphalt concrete pavement construction using performance models for fatigue and rutting based on the analysis of accelerated pavement tests from the Caltrans Heavy Vehicle Simulator (HVS) and the WesTrack accelerated pavement performance test program. For rutting, the influence of asphalt content, airvoid content, and aggregate gradation are considered. For fatigue, airvoid content, asphalt content, and asphalt concrete thickness are included. Costs are established using a cost model considering only agency cost consequences of delaying or accelerating the time to the next rehabilitation. For the as-constructed mix, the relative performance (RP)-the ratio of off-target ESALs to target ESALs-is determined for both fatigue and rutting. The shortest RP for the combined RP's for mix and pavement characteristics considered for a specific distress mode permits determination of the pay factor from the cost model. Pay factors determined by this methodology are compared with those that have been used by the California Department of Transportation (Caltrans), termed an experience-based approach. This set of pay factors has been in use since 1997 for Quality Control/Quality Assurance projects. Comparisons are included for approximately 80 projects constructed in the period January 1997 to June 2000. Only a limited number of these contained measured rutting and fatigue cracking data that had been incorporated in the Caltrans Pavement Management System. Comparisons of pay factors for these projects determined by the two methodologies are also included. An analysis is presented which compares pay factors calculated at the end of the project based on the total tonnage to the average of the pay factors based on the daily total tonnage. A computer application using the performance based approach is also included.
机译:本文基于对Caltrans重型车辆模拟器(HVS)的加速路面测试和WesTrack加速路面性能测试程序的分析,简要总结了使用疲劳和车辙性能模型定量确定沥青混凝土路面施工付费因子的程序。对于车辙,要考虑沥青含量,气隙含量和骨料级配的影响。对于疲劳,包括气隙含量,沥青含量和沥青混凝土厚度。使用成本模型建立成本时,仅考虑延迟或加快下一次康复时间的代理成本后果。对于混合结构,要确定疲劳和车辙的相对性能(RP)(偏离目标的ESAL与目标ESAL的比率)。针对特定遇险模式考虑的混合和路面特性的组合RP的最短RP允许从成本模型确定支付因子。将通过这种方法确定的薪酬因素与加利福尼亚交通运输部(Caltrans)使用的薪酬因素进行比较,这被称为基于经验的方法。自1997年以来,这组薪酬因素已用于质量控制/质量保证项目。比较包括了1997年1月至2000年6月期间建造的大约80个项目。其中只有有限的一些包含已测量的车辙和疲劳裂纹数据,这些数据已纳入Caltrans路面管理系统中。还包括通过两种方法确定的这些项目的薪酬因素的比较。提出了一项分析,该分析将在项目结束时基于总吨位计算的薪酬因子与基于每日总吨位的薪酬因子的平均值进行比较。还包括使用基于性能的方法的计算机应用程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号