...
首页> 外文期刊>Asian Power >India's ambitious smart grid roadmap failing to bear fruit
【24h】

India's ambitious smart grid roadmap failing to bear fruit

机译:印度雄心勃勃的智能电网路线图未能取得成果

获取原文
获取原文并翻译 | 示例
           

摘要

If the number of planned investments over the next decade is any indicator, then support for India's smart grid development should currently be surging and enjoying peak demand. However, this may fluctuate, according to analysts. According to a report released in January by Northeast Group LLC, entitled "India Smart Grid: Market Forecast (2015-2025)", the Indian government plans to invest a total of $26.1 billion in smart grid infrastructure over the next 10 years - a large sum that could go a long way, given the right conditions.
机译:如果未来十年的计划投资数量有任何指标,那么对印度智能电网发展的支持目前应该会激增并达到高峰需求。但是,据分析师称,这可能会有所波动。根据东北集团有限责任公司1月发布的题为“印度智能电网:市场预测(2015-2025)”的报告,印度政府计划在未来10年中向智能电网基础设施投资总计261亿美元-在适当的条件下,总和可能会大有帮助。

著录项

  • 来源
    《Asian Power》 |2015年第68期|26-27|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号