...
首页> 外文期刊>Asia-Pacific Journal of Operational Research >IRREVERSIBLE INVESTMENT, OPERATING FLEXIBILITY, AND TIME LAGS
【24h】

IRREVERSIBLE INVESTMENT, OPERATING FLEXIBILITY, AND TIME LAGS

机译:不可思议的投资,运营灵活性和时滞

获取原文
获取原文并翻译 | 示例

摘要

We consider an optimal investment problem when a firm such as an electric power company has the operational flexibility to expand and contract capacity with fixed cost. This problem is formulated as an impulse control problem combined with optimal stopping. Consequently, we obtain optimal investment timing, optimal capacity expansion and contraction timing, and the investment value. We also show investment, capacity expansion and contraction rule are influenced by the price volatility and the initial capacity is also influenced by the ratio between base-load plant and peak-load plant. In addition, we investigate how time lag between investment and operation influences the investment rule.
机译:当诸如电力公司之类的公司具有以固定成本扩展和收缩容量的运营灵活性时,我们考虑最佳投资问题。将该问题表述为与最佳停止相结合的脉冲控制问题。因此,我们获得了最佳的投资时机,最佳的产能扩张和收缩时机以及投资价值。我们还表明,价格波动会影响投资,产能扩张和收缩规律,而基本负荷工厂与高峰负荷工厂之间的比率也会影响初始产能。此外,我们研究了投资与运营之间的时滞如何影响投资规则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号