首页> 外文期刊>建築雑誌 >MIKAWA ELEMENTARY & JUNIOR HIGH SCHOOL
【24h】

MIKAWA ELEMENTARY & JUNIOR HIGH SCHOOL

机译:三河小学和初中

获取原文
获取原文并翻译 | 示例
       

摘要

Parts of 3 existing elementary schools were modified and added to the existing junior high school in the same plot. The remaining facilities were moved into a new one-story building. A 1.2m difference in elevation led to the creation of a dedicated ground for the lower grade classrooms facing the south and a music room with tiered floors to the north. Implementation of a solar collecting system serves as practical teaching materials as well as to achieve a pleasant environment in both winter and summer. The water used in toilets comes from a rain water storage tank placed under the classrooms. Ayasugi, the locally grown cedar, was configured for frames and structural systems in the classrooms and gymnasium. The completion of the gymnasium with large scale, intricate framework could not be achieved without the exceptional skill of local carpenters with the knowledge from the past.
机译:现有的3所小学的一部分进行了修改,并在同一地块中添加到了现有的初中。其余的设施被转移到新的一层楼房中。海拔高度相差1.2m导致为面向南的低年级教室创建了专用地面,向北创建了带分层地板的音乐室。实施太阳能收集系统既可作为实用的教学材料,又可在冬季和夏季实现宜人的环境。厕所中使用的水来自教室下面的雨水储水箱。本地生产的雪松Ayasugi被配置用于教室和体育馆的框架和结构系统。没有本地木匠的过硬知识,就无法完成大规模,复杂的体育馆的建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号