A Novel Step Toward Repetitive Projects Scheduling Using Geographic Information Systems

机译:利用地理信息系统实现重复项目计划的新步骤

获取原文
获取原文并翻译 | 示例
           

摘要

Unique scheduling challenges are presented by the construction projects having repetitive activities. The present study dealswith the development of a scheduling tool to meet the requirements of projects having repetitive activities. Generally, theschedule of a repetitive construction project is made by using commercially available scheduling tools like Primavera andMicrosoft Project. The link between 2D drawings/3D components and repetitive schedule is missing in these schedulingtools. The literature indicates the use of 4D modeling in case of non-repetitive construction projects to establish this link. In4D modeling, a graphical simulation of the execution sequence is developed by linking 3D components with the scheduleof a facility to be developed. 4D modeling tools lack in certain features such as generating/updating schedule, linking 3Dcomponents with schedule, and consideration of surroundings into a common platform. Geographic information systemsbasedenvironment has been explored in the present study for the development of the tool for repetitive scheduling, linking3D components with the repetitive schedule, and to develop 4D model of the execution sequence of a repetitive constructionproject. 3D components developed for 4D modeling were also used for cost estimation. 4D model of the execution sequenceand cost estimate together constitutes a 5D system for repetitive construction projects.
机译:具有重复性活动的建设项目提出了独特的调度挑战。本研究涉及计划工具的发展,以满足具有重复性活动的项目的要求。通常,通过使用诸如Primavera和Microsoft Project之类的可购买到的计划工具来制定重复建设项目的计划。这些计划工具缺少2D工程图/ 3D组件与重复计划之间的链接。文献表明在非重复建设项目中使用4D建模来建立此链接。在4D建模中,通过将3D组件与要开发的设备的时间表链接起来,可以对执行序列进行图形仿真。 4D建模工具缺少某些功能,例如生成/更新进度表,将3D组件与进度表链接以及将周围环境考虑到一个通用平台中。在本研究中,已经探索了基于地理信息系统的环境,以开发重复性计划工具,将3D组件与重复性计划链接起来,并开发重复性建设项目的执行顺序的4D模型。为4D建模开发的3D组件也用于成本估算。执行顺序和成本估算的4D模型共同构成了重复建设项目的5D系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号