TIME-STEPPED, SIMULATION-BASED SCHEDULING SYSTEM FOR LARGE-SCALE INDUSTRIAL CONSTRUCTION PROJECTS

机译:大型工业建设项目的基于时间的模拟调度系统

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Industrial construction projects have recently moved more towards tighter schedules and fast-tracked engineering and construction. This leads to overlap between work packages, increased occurrences of resource over-allocation and site congestion, which pose challenges to project planners in scheduling construction works and dynamically allocating resources considering the construction site conditions. Most previous research related to scheduling and resource allocation assumes that allocated resources remain consistent throughout the execution of work packages. This paper presents a workface planning system that allows for variable resource allocation and variable durations in execution of a work package, while holding logic relationships and space congestion constraints. A case study from a real industrial project is presented and results show that the proposed system reduces resource idle time as well as returns shorter project duration than traditional scheduling approaches.
机译:工业建筑项目最近已朝着更加紧迫的时间表和快速的工程建设方向发展。这导致工作包之间的重叠,资源超额分配的增加和站点拥塞的发生,这给项目计划人员在安排施工工作和考虑施工现场条件进行动态分配资源时带来了挑战。以前与调度和资源分配有关的大多数研究都假设分配的资源在工作包执行期间保持一致。本文提出了一种工作面计划系统,该系统允许在执行工作包时进行可变的资源分配和可变的持续时间,同时保留逻辑关系和空间拥塞约束。给出了一个实际工业项目的案例研究,结果表明,与传统的调度方法相比,该系统减少了资源闲置时间,并缩短了项目工期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号