首页> 外文期刊>Applied Energy >GIS-based approach for assessing the energy potential and the financial feasibility of run-off-river hydro-power in Alpine valleys
【24h】

GIS-based approach for assessing the energy potential and the financial feasibility of run-off-river hydro-power in Alpine valleys

机译:基于GIS的高山山谷径流水电能源潜力和财务可行性评估方法

获取原文
获取原文并翻译 | 示例
           

摘要

In the last decade, European attractive policies are favoring the construction of new run-off hydro-power plants. The realization cost of these plants is quite low in mountain areas thanks to small water discharges and high gross heads. For this reason, small rivers have been strongly exploited without considering an optimal use of the resource. Nowadays, available sites are often in areas with low accessibility and a greater specific cost of civil engineering works. However, during the planning of new small hydro-power plants, the dependency of physical, technical, legal and financial variable on space is often not assessed. The tool presented in this paper addresses this gap to support the planning of run-off-river plants. The method improves on previous approaches by (1) integrating all the legal, technical and financial analysis in a GIS tool, and (2) trying to validate the site-specific model with local knowledge. The tool is applied to the Gesso and Vermenagna valleys in the Alps. Information and data were collected and discussed with local stakeholders in order to improve the model results.
机译:在过去的十年中,欧洲具有吸引力的政策正在鼓励建设新的径流水力发电厂。由于排水量少和总水头高,山区的这些植物的实现成本相当低。因此,在不考虑资源最佳利用的情况下,小河流被大量开采。如今,可用的站点通常位于交通不便且土木工程成本较高的区域。但是,在规划新的小型水力发电厂期间,经常不评估物理,技术,法律和财务变量对空间的依赖性。本文介绍的工具解决了这一差距,以支持径流河电厂的规划。通过(1)将所有法律,技术和财务分析整合到GIS工具中,以及(2)尝试使用本地知识验证特定于站点的模型,该方法对以前的方法进行了改进。该工具适用于阿尔卑斯山的Gesso和Vermenagna山谷。收集信息和数据并与当地利益相关者讨论,以改善模型结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号