首页> 外文期刊>APICS >GETTING THE PARTS YOU NEED
【24h】

GETTING THE PARTS YOU NEED

机译:获得所需的零件

获取原文
获取原文并翻译 | 示例
           

摘要

Reader R.W. called in reference to developing MRP bills of material (BOM) in a remanufacturing environment. He referenced the use of low-level codes in developing the bills. We decided to dig a little deeper to define low-level codes. A series of subassemblies within a final assembly often will use common parts throughout the product. Or several products may be employed throughout, especially electronic parts, hardware, and consumable materials. Without the use of low-level coding, every time that part appears in a planning scenario—within a product or across several products—the system will evaluate the need to reorder after comparing the demand to the on-hand balance and open orders. An independent assessment to determine availability would be made, without taking into consideration the other parts in the process vying for the same inventory.
机译:读者R.W.提到在再制造环境中开发MRP物料清单(BOM)。他提到在制定法案时使用低级代码。我们决定更深入地定义底层代码。最终装配中的一系列子装配通常会在整个产品中使用通用零件。或者可以使用多种产品,尤其是电子零件,硬件和消耗性材料。在不使用低级编码的情况下,每当零件出现在计划场景中时(在一个产品中或在多个产品中),系统都会在将需求与现有余额和未结订单进行比较之后评估重新订购的需求。将进行独立评估以确定可用性,而不考虑争夺同一库存的流程中的其他部分。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号