In this paper, we study the project staffing problem with discrete time/resource trade-offs to minimise the personnel staffing budget. This staffing problem embeds activity scheduling flexibility by incorporating the project scheduling problem into the personnel staffing problem to improve the quality of the staffing plan. In addition, we introduce extra demand scheduling flexibility resulting from the design of alternative execution modes for the activities, modelled via discrete time/resource trade-offs. In this way, the project manager is able to decide on the team size and duration for every activity. We propose a two-stage methodology to first design specific alternative activity modes using heuristic rules-of-thumb and subsequently we assess the resulting quality, i.e. the staffing cost, via the integrated composition of the project schedule and associated staffing plan. The heuristic mode generation rules determine the selection of a limited set of relevant activities and modes. The computational results show that the impact of these heuristic generation rules on the staffing budget is dependent on the defined relation between different activity alternatives for a particular activity and on the estimated characteristics of the activity base modes. We show that by focusing on a particular well-chosen subset of activity alternatives or on a particular subset of activities, high-quality solutions realising most of the potential cost improvements resulting from the discrete time/resource trade-offs can be derived with a reduced effort.
机译:在本文中,我们使用离散时间/资源权衡研究项目人员配置问题,以尽量减少人员人员配置预算。此人员配置问题通过将项目调度问题纳入人事人员配置问题,以提高人员配置计划的质量,嵌入活动调度灵活性。此外,我们引入了额外的需求调度灵活性,该灵活性由设计的替代执行模式设计,通过离散时间/资源权衡建模。通过这种方式,项目经理能够为每项活动决定团队规模和持续时间。我们提出了一种双阶段方法,首先使用拇指规则设计特定的替代活动模式,并随后通过项目时间表和相关人员配置计划的综合组成来评估所产生的质量,即人员配置成本。启发式模式生成规则确定有限一组相关活动和模式的选择。计算结果表明,这些启发式生成规则对人员配置预算的影响取决于特定活动的不同活动替代品之间的定义关系以及活动基础模式的估计特征。我们表明,通过专注于特定的良好的活动替代品或特定的活动子集,可以通过减少来导出从离散时间/资源权衡产生的大多数潜在成本改进的高质量解决方案努力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号