...
首页> 外文期刊>Annals of Operations Research >Over-time and over-level replacement policies with random working cycles
【24h】

Over-time and over-level replacement policies with random working cycles

机译:具有随机工作周期的加班和加班更换政策

获取原文
获取原文并翻译 | 示例

摘要

When a unit is running successive works with cycle times, it would be uneconomical or impractical to do maintenances during any working cycle. This paper firstly reviews two replacement models proposed in literatures as follows: (1) replacement is done over a planned time at the completion of the working cycle, which is called over-time replacement, and (2) replacement is done over damage level at the completion of the forthcoming working cycle, which is called over-level replacement. From the viewpoint of replacement cost savings, we secondly focus on comparisons of over-time replacement and its standard age-based policy, over-level replacement and its standard condition-based policy. Furthermore, modified over-time and over-level replacement costs are obtained to specify critical points at which these new replacements, rather than their standard polices, would save more replacement costs. Discussions in this paper are given analytically and computed numerically.
机译:当一个单元按周期运行连续工作时,在任何工作周期内进行维护都是不经济或不切实际的。本文首先回顾了文献中提出的两种替换模型,如下:(1)在工作周期完成时按计划时间进行替换,这称为超时替换;(2)在超过损坏水平的情况下进行替换完成即将到来的工作周期,这称为高级别更换。从节省重置成本的角度出发,我们接下来将重点放在比较超时工作及其基于年龄的标准政策,高层替换及其基于条件的标准政策上。此外,获得了经过修改的加班和超额替换成本,以指定关键点,在这些关键点上,这些新替换项(而不是其标准策略)将节省更多的替换项成本。本文的讨论是通过分析和数值计算得出的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号