Ross River Dam is located approximately 15 km upstream of Townsville and provides a dual role of water supply and flood mitigation. The dam comprises a 39.6m long concrete overflow spillway flanked by a central core rockfill embankment of 300 m in length with a 7,620 m long left bank earth fill embankment, which has inadequate internal filter zones for piping protection. Since completion, design rainfall predictions for the area have doubled, technical data has changed and so, too, have dam safety standards. Dam safety evaluations during 2000-2002 showed that the dam required upgrading in order to bring it up to international standards. As an interim measure, the spillway was cut down by 3.6m. Upgrade design works were then completed using risk-based design criteria to validate the design, and construction is in progress. The upgrade works comprise spillway anchoring, installation of three radial gates on the spillway, stilling basin modifications, embankment filter protection, and dam crest raising. This paper presents the options considered, the method of reliability analysis, and how the results influenced the spillway system design and overall risk evaluation for the upgrade design.
机译:罗斯河水坝位于汤斯维尔上游约15公里处,在供水和缓解洪水方面起着双重作用。该大坝包括一个长39.6m的混凝土溢洪道,其两侧为一个长度为300 m的中央堆石路堤和一个7,620 m长的左岸土石填筑路堤,该路堤的内部过滤区域不足以进行管道保护。自建成以来,该地区的设计降雨预测翻了一番,技术数据已更改,因此也有大坝安全标准。 2000年至2002年期间的大坝安全评估表明,大坝需要升级才能使其达到国际标准。作为临时措施,溢洪道被削减了360万。然后,使用基于风险的设计标准来完成升级设计工作,以验证设计,并且施工正在进行中。升级工程包括溢洪道锚固,在溢洪道上安装三个径向闸门,进行静水池改造,堤防过滤器保护以及坝顶抬高。本文介绍了考虑的选项,可靠性分析方法以及结果如何影响溢洪道系统设计和升级设计的整体风险评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号