首页> 外文期刊>American Water Works Association Journal >The Ground Water Rule: moving from framework to implementation
【24h】

The Ground Water Rule: moving from framework to implementation

机译:地下水法则:从框架过渡到实施

获取原文
获取原文并翻译 | 示例
           

摘要

States and utilities are beginning to review and more fully comprehend the GWR. Under the SDWA, states initially have two years following rule promulgation to obtain primacy, unless they solicit USEPA for an extension, which may be for up to an additional two years. Although some states, such as Colorado and New Jersey, are actively developing regulations and policies necessary to obtain primacy for the GWR, no state has submitted its primacy application to USEPA (2008). Now is the time for utilities to get involved at the state level to write their own GWRs. Current USEPA guidance, which explains mandatory provisions and offers nonmandatory advice, remains incomplete, with three of seven anticipated guidance documents yet to be distributed (sanitary survey, corrective action, and triggered monitoring) and two of the guidance manuals available in draft, rather than final form (source water assessment and state implementation).
机译:州和公用事业机构正在开始审查并更全面地理解GWR。根据SDWA,各州最初在规则颁布后有两年的时间才能获得优先地位,除非它们要求USEPA进行延期,最长可能再延长两年。尽管某些州(例如科罗拉多州和新泽西州)正在积极制定必要的法规和政策,以获得GWR的首要地位,但没有哪个州向USEPA提交了首要地位申请(2008年)。现在是公用事业进入州一级编写自己的GWR的时候了。目前的USEPA指南(其中解释了强制性条款并提供非强制性建议)仍然不完整,尚待分发的七个预期指导文件(卫生调查,纠正措施和触发的监视)中有三个,草案中有两个指导手册,而不是最终形式(源水评估和州实施)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号