Alstom-Rusal partnership delivers rectifier system for Bratsk smelter

机译:阿尔斯通与俄罗斯的合作伙伴关系为布拉茨克冶炼厂提供整流器系统

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A joint venture set up between Alstom and Rusal has developed and commissioned a series of rectifier units for dedicated power applications at the world's largest aluminium smelter, Bratsk in Siberia. The total capacity of this massive plant exceeds 1m tpy of aluminium each. The tailored rectifier design was developed entirely by the JV engineering team taking into consideration all the requirements of the end customer and incorporating many years of combined experience in the design and operation of such equipment. For example, the overall dimensions and connectivity of the equipment allowed the smelter substation to be revamped without any change to the existing bus bar configuration and buildings. The use of latest system components and also the maximum possible localisation of production enabled the equipment to be developed with high performance and reliability - and, according to both companies, at an attractive market cost. Before the start of series production, pre-production samples were manufactured and thoroughly tested to confirm their high performance, and also to help make a number of refinements in the design and production technology.
机译:阿尔斯通与俄罗斯铝业公司之间的合资企业已经开发并调试了一系列整流器单元,用于世界最大的铝冶炼厂西伯利亚的专用电力应用。这个大型工厂的总产能每个超过100万吨/年铝。量身定制的整流器设计完全由合资工程团队考虑最终用户的所有要求,并结合了此类设备的设计和操作多年的经验。例如,设备的整体尺寸和连通性允许对冶炼厂变电站进行改造,而无需更改现有的母线配置和建筑物。两家公司均表示,使用最新的系统组件以及最大可能的生产本地化使该设备的开发具有高性能和可靠性-并且据两家公司称,它们的市场价格具有吸引力。在开始批量生产之前,已经生产了预生产的样品并进行了全面测试,以确认其高性能,并且还有助于在设计和生产技术上进行许多改进。

著录项

  • 来源
    《Aluminium》 |2015年第2期|83-83|共1页
  • 作者

    Ken Stanford;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号