Sustaining capital of alumina refinery projects

机译:维持氧化铝精炼项目的资本

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Sustaining capital cost (or expenditure), abbreviated as sustaining capex or Su-sex, is a project cost item which is easily overlooked and sometimes ignored. To many it is unknown and it may be (partly) hidden in other operating cost items. The relationship - and the difference - with repair and maintenance costs is not always clear and may inadvertently lead to incomplete cost estimates. This article is based on a paper presented at the TMS Light Metals 2016 conference. It explores several facets of sustaining capital and aims at clarifying some of these Su-sex issues for alumina refinery projects.
机译:维持资本成本(或支出),缩写为维持资本支出或Su-sex,是一个项目成本项目,很容易被忽略,有时被忽略。对于许多人来说,这是未知的,并且可能(部分)隐藏在其他运营成本项目中。与维修和维护成本之间的关系(以及差异)并不总是很清楚,并且可能会无意中导致不完整的成本估算。本文基于在TMS轻金属2016大会上发表的一篇论文。它探讨了维持资本的几个方面,目的是阐明氧化铝精炼项目中的一些性问题。

著录项

  • 来源
    《Aluminium》 |2016年第8期|40-43|共4页
  • 作者

    P.-H. ter Weer;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号