首页> 外文期刊>Airforces Monthly >Penultimate Spanish Typhoon
【24h】

Penultimate Spanish Typhoon

机译:倒数第二个西班牙台风

获取原文
获取原文并翻译 | 示例
           

摘要

SEEN LANDING at Getafe air base on May 31 is Ejercito del Aire (EA, Spanish Air Force) Eurofighter Typhoon C.16-77 '14-35'/10234, the penultimate example for the service to come off the Airbus production line. The aircraft was returning from a Multifunctional Information Distribution System (MIDS) test flight, one of the last evaluations prior to handover to Ala 14 based at Albacete. It's planned that the final aircraft from the original order for 72 will be delivered to the EA next July. The air arm operates a total of 67 aircraft, as three have been lost in accidents. A second order for additional Eurofighters could be signed soon as the aircraft is the EA's preferred option to replace the ageing fleet of secondhand F/A-18As in service with Ala 46 at Gando in the Canary Islands, of which around 20 are still in service. These aircraft, operated by 462 Escuadron, are currently receiving major maintenance work to extend their service life to 2025. To make up for this, the EA periodically sends a number of EF-18Ms from Ala 12 or Ala 15 to Gando to support air defence of the archipelago.
机译:5月31日在赫塔费空军基地看到的着陆点是埃耶西托·德尔·埃雷(西班牙空军EA)欧洲战斗机台风C.16-77 '14 -35'/ 10234,这是该服务从空中客车生产线倒数的倒数第二个例子。这架飞机正在从多功能信息发布系统(MIDS)试飞中返回,这是在移交给总部位于阿尔巴塞特的Ala 14之前进行的最后一次评估。按照计划,原定订单中的72架最终飞机将在明年7月交付给EA。空中航线共运营67架飞机,其中3架在事故中丧生。 EA的首选方案是用这架飞机替换旧的F / A-18A机队,以在加那利群岛的加多(Gando)的Ala 46替换现役的二手F / A-18A机队。 。这些飞机由462 Escuadron运营,目前正在接受重大维护工作,以将其使用寿命延长至2025年。为此,EA定期从Ala 12或Ala 15向Gando发送了一些EF-18M,以支持防空群岛。

著录项

  • 来源
    《Airforces Monthly》 |2019年第377期|12-12|共1页
  • 作者

    Roberto Yanez;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号