首页> 外文会议>International Conference on Advances in Energy and Environmental Research >Research on Pre-control of Typhoon Disaster in Construction Site under Extreme Typhoon Climate-- Take typhoon Moranti as an example
【24h】

Research on Pre-control of Typhoon Disaster in Construction Site under Extreme Typhoon Climate-- Take typhoon Moranti as an example

机译:极端台风气候施工现场预防施工现场预防研究 - 以台风莫兰蒂为例

获取原文

摘要

This article focuses on the damage to the construction project caused by the strong typhoon "Moranti" No. 14 of 2016 to the coastal city of Xiamen, and further analyzes the characteristics of the extreme typhoon climate, like strong destruction,extensive damage and obvious characteristics of the centralization, and the causes of the damage to the construction project. Leading to the conclusion that the risk items in the construction site mainly include personnel, scaffolds, and mechanical and electrical equipment, etc. Combined with the impact factors of duration, structure scale, economic exposure, and corporate management level, establishing the criteria for judging the extreme typhoon climate risk pre-control level and calculating the comprehensive level according to the level of each element and the weight distribution, and then, put forward pre-control measures and recommendations accordingly for government decision-making and construction companies' reference.
机译:本文重点介绍对厦门沿海市的强势台风“莫里迪”第14号强大台风“莫兰蒂”造成的建设项目的损害,进一步分析了极端台风气候的特点,如强大的破坏,广泛损害和明显的特点集中化,建设项目损坏的原因。导致施工现场的风险项目主要包括人员,脚手架和机电设备等。结合持续时间,结构规模,经济曝光和企业管理水平的影响因素,建立判断的标准极端台风气候风险预控制水平并根据每个元素的水平和重量分配的综合水平,然后提出了政府决策和建设公司的参考的预防控制措施和建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号