首页> 外文期刊>Air International >PAK-FA Service Entry
【24h】

PAK-FA Service Entry

机译:PAK-FA服务条目

获取原文
获取原文并翻译 | 示例
           

摘要

Russia's deputy defence minister responsible for procurement, Yury Borisov, revealed the latest fielding plan for the T-50 (PAK-FA) fifth-generation fighter on February 2. Borisov said deliveries to front-line squadrons could begin after 2018 and continue within the period of the next State Armaments Programme between 2018 and 2025. Borisov hinted the current most important task is to complete the T-50's test programme, possibly suggesting there are lots of test points still to be completed in the protracted state flight test and evaluation run by the Russian Air Force with support from the manufacturer Sukhoi.
机译:俄罗斯负责采购的国防部副部长尤里·鲍里索夫(Yury Borisov)于2月2日透露了T-50(PAK-FA)第五代战斗机的最新部署计划。鲍里索夫表示,向第一中队的交付可能会在2018年之后开始,并继续在该地区进行。在下一个国家军备计划的2018年至2025年期间。鲍里索夫暗示当前最重要的任务是完成T-50的测试计划,这可能表明在长时间的国家飞行测试和评估中仍有许多测试点需要完成由俄罗斯空军在制造商Sukhoi的支持下进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号