...
首页> 外文期刊>Africa energy intelligence >Questions surround Elton's port of Dakar gas terminal project
【24h】

Questions surround Elton's port of Dakar gas terminal project

机译:问题环绕埃尔顿港的达喀尔港口项目

获取原文
获取原文并翻译 | 示例
           

摘要

Many questions surround the Port Autonome de Dakargas terminal project, the concession for which wasawarded to Elton Oil on 18 March in the presence of theSenegalese president Macky Sall. Where will the gascome from? How will it be transported? When will theconstruction of the infrastructure begin? Elton haspledged an investment of FCFA 70bn ($121m) but theprecise nature of the project remains unclear. Whencontacted, the Dakar-based petroleum productsdistributor stated that the liquefied natural gas (LNG)would be conveyed from the "European zone" on "shipsdesigned for the purpose". No firm date has been set forthe commencement of the works, but Elton indicatedthat they would get underway "within the next six totwelve months".
机译:许多问题环绕着港口自动体内德达卡尔天然气终端项目,所以的特许权3月18日在3月18日颁发给埃尔顿石油塞内加尔总统麦克尼斯拉尔。气体将在哪里来自?它将如何运输?什么时候愿意基础设施的建设开始了吗?埃尔顿有承诺投资FCFA 70bn(121米)但是项目的精确性质尚不清楚。什么时候联系,基于达喀尔的石油产品经销商表示液化天然气(LNG)将从“欧洲区”上传达“船舶专为此目的而设计“。没有设定牢固的日期作品的开始,但埃尔顿表示他们会在未来六点内进行正在进行的“十二个月”。

著录项

  • 来源
    《Africa energy intelligence》 |2021年第15期|14-15|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号