首页> 外文期刊>Advances in civil engineering >Effect of Deficiencies in the Tunnel Crown Thickness on Pressure Tunnels with Posttensioned Concrete Linings
【24h】

Effect of Deficiencies in the Tunnel Crown Thickness on Pressure Tunnels with Posttensioned Concrete Linings

机译:隧道顶厚不足对后张混凝土衬砌压力隧道的影响

获取原文
获取原文并翻译 | 示例
           

摘要

This paper investigates the effect of deficiencies in the tunnel crown thickness on pressure tunnels with the posttensioned concrete lining. Based on the lining parameters of the Yellow River Crossing Tunnel, the modeling approach of the posttensioned concrete lining is introduced in detail and a three-dimensional finite element model is established. The three-dimensional finite element model is validated by experimental results from the full-scale model experiment of the Yellow River Crossing Tunnel. Special attention is given to the changes in the deformation, radial displacement, and circumferential stress of the posttensioned concrete lining with gradual decreases in the tunnel crown thickness. The calculation results show that the influence scopes of deficiencies in the tunnel crown thickness are mainly concentrated in the crown and its adjacent parts. The posttensioned concrete lining can still maintain a satisfactory stress state when deficiencies in the tunnel crown thickness exist, and undesirable stress levels may be caused only when the tunnel crown thickness decreases below a certain threshold. Furthermore, cracks are most likely to occur at the external and internal surfaces of the crown and at the internal surface of the crown's adjacent parts, which is useful for taking measurements regarding the lining tightness and stability.
机译:本文研究了后冠混凝土厚度对压力隧道的影响,对隧道冠厚不足的影响。根据黄河隧道的衬砌参数,详细介绍了后张法混凝土衬砌的建模方法,建立了三维有限元模型。三维有限元模型通过黄河道口隧道全尺寸模型试验的结果进行了验证。特别注意后张应力混凝土衬砌的变形,径向位移和周向应力的变化,隧道顶冠厚度逐渐减小。计算结果表明,缺陷对隧道顶冠厚度的影响范围主要集中在顶冠及其邻近部位。当隧道顶冠厚度存在缺陷时,后张预应力混凝土衬砌仍可以保持令人满意的应力状态,并且仅当隧道顶冠厚度减小到一定阈值以下时,才可能导致不希望的应力水平。此外,在胎冠的外表面和内表面以及胎冠的相邻部分的内表面上最有可能发生裂纹,这对于进行关于衬里的紧密度和稳定性的测量是有用的。

著录项

  • 来源
    《Advances in civil engineering》 |2018年第5期|2757542.1-2757542.14|共14页
  • 作者

    Qin Gan; Cao Shengrong; Yang Fan;

  • 作者单位

    Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Hubei, Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号