首页> 外文期刊>Accountancy >BELATED PLANNING PERMISSION
【24h】

BELATED PLANNING PERMISSION

机译:迟来的规划许可

获取原文
获取原文并翻译 | 示例
           

摘要

The VAT zero rate for construction of new residential property requires correct planning permission to be in place. A new building can arise where an old building is demolished and replaced. It can therefore happen that permission is initially obtained to extend an existing property, but the permission is later changed (owing to circumstances) to allow demolition and rebuilding. The revised permission is sometimes confirmed officially only after the builder has embarked upon complete replacement. The question, then, is whether such a change in permission can affect the VAT on the construction services pre-dating the change.
机译:新住宅物业的增值税零税率要求获得正确的规划许可。在旧建筑物被拆除和替换的情况下,可能会出现新建筑物。因此,可能会发生以下情况:最初获得扩展现有属性的权限,但后来(由于环境原因)更改了权限,以允许拆除和重建。有时只有在建筑商着手进行完全更换之后,才正式确认修订后的许可。那么,问题是许可的这种变更是否会影响变更之前的建筑服务增值税。

著录项

  • 来源
    《Accountancy》 |2017年第1483期|30-30|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号