首页> 美国卫生研究院文献>other >Scheduling Projects with Multiskill Learning Effect
【2h】

Scheduling Projects with Multiskill Learning Effect

机译:安排具有多技能学习效果的项目

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

We investigate the project scheduling problem with multiskill learning effect. A new model is proposed to deal with the problem, where both autonomous and induced learning are considered. In order to obtain the optimal solution, a genetic algorithm with specific encoding and decoding schemes is introduced. A numerical example is used to illustrate the proposed model. The computational results show that the learning effect cannot be neglected in project scheduling. By means of determining the level of induced learning, the project manager can balance the project makespan with total cost.
机译:我们研究了具有多技能学习效果的项目进度问题。提出了一个新的模型来解决该问题,其中考虑了自主学习和诱导学习。为了获得最优解,引入了具有特定编码和解码方案的遗传算法。数值示例说明了该模型。计算结果表明,在项目调度中不能忽视学习效果。通过确定诱导学习的水平,项目经理可以平衡项目的工期和总成本。

著录项

  • 期刊名称 other
  • 作者

    Hong Zha; Lianying Zhang;

  • 作者单位
  • 年(卷),期 -1(2014),-1
  • 年度 -1
  • 页码 731081
  • 总页数 7
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号