首页> 美国卫生研究院文献>BMJ Open Quality >Care bundles for acute kidney injury: a balanced accounting of the impact of implementation in an acute medical unit
【2h】

Care bundles for acute kidney injury: a balanced accounting of the impact of implementation in an acute medical unit

机译:急性肾损伤护理包:对急性医疗部门实施影响的平衡评估

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In 2009, a National Confidential Enquiry into Patient Outcome and Death report detailed significant shortcomings in recognition and management of patients with acute kidney injury (AKI). As part of a national collaborative to reduce harm from AKI, the Scottish Patient Safety Programme developed two care bundles to improve response (‘SHOUT’) and review (‘BUMP’) of AKI.Baseline data from eight patients with AKI on the acute medical unit (AMU) in Ninewells Hospital showed 62% compliance with SHOUT. However, most patients were transferred from AMU within 24 hours so BUMP could not be assessed. Our aim was to achieve >95% compliance with SHOUT on AMU within 2 months. The content of the SHOUT bundle was condensed onto a sticker for the case notes, which was implemented using Plan-Do-Study-Act cycles. Compliance was assessed weekly and feedback obtained from stakeholders concerning their opinion of the sticker, SHOUT bundle and care bundles in general.Use of the sticker was 27% in week 1 but fell to 5% by week 4. Compliance with the bundle varied from 45% to 60% and was only slightly improved by use of the sticker (OR 1.58, 95% CI 0.39 to 6.42). Staff found the sticker burdensome and did not agree that all elements of SHOUT were equally important. This opinion was supported by finding that their compliance with sepsis and hypovolaemia recommendations was 91%–100% throughout, whereas urinalysis was documented in only 55%–63% of patients. Several staff mentioned ‘bundle fatigue’ and on one day we identified 22 other care bundles or structured improvement forms in AMU.We concluded that the AMU staff had legitimate concerns about the SHOUT care bundle and that our intervention was demotivating. Overcoming bundle fatigue will not be a simple task. We plan to work with staff on integrating AKI into patient safety huddles and on using modelling and recognition of good practice to improve motivation.
机译:2009年,《国家机密患者病死率调查报告》详细介绍了在识别和管理急性肾损伤(AKI)患者方面的重大缺陷。作为减少AKI危害的国家合作计划的一部分,苏格兰患者安全计划开发了两个护理包以改善AKI的反应('SHOUT')和评估('BUMP')。8位急性医疗的AKI患者的基线数据Ninewells医院的病房(AMU)对SHOUT的依从性达到62%。但是,大多数患者是在24小时内从AMU转移过来的,因此无法评估BUMP。我们的目标是在2个月内使AMU的SHOUT达标率达到95%以上。 SHOUT软件包的内容被压缩到案例记录的标签上,该标签是使用Plan-Do-Study-Act周期实现的。每周评估一次合规性,并从利益相关者那里获得关于他们对贴纸,SHOUT套装和护理套装的总体看法的反馈。贴纸的使用在第1周中占27%,但到第4周降至5%。 %至60%,仅通过使用贴纸略有改善(OR 1.58,95%CI 0.39至6.42)。工作人员发现标贴繁重,不同意SHOUT的所有要素同样重要。这一观点得到支持,发现他们对败血症和低血容量建议的遵守率总体上为91%–100%,而只有55%–63%的患者记录了尿液分析。数名员工提到“捆绑疲劳”,有一天,我们在AMU中发现了22个其他护理包或结构性改善形式。我们得出结论,AMU人员对SHOUT护理包有合理的担忧,我们的干预无济于事。克服束疲劳不是一个简单的任务。我们计划与员工合作,将AKI整合到患者安全防护中,并使用建模和良好实践的认可来提高动力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号