首页> 美国卫生研究院文献>The Aesculapian >Linking the physical past to the program future: new library addition at the Medical College of Georgia.
【2h】

Linking the physical past to the program future: new library addition at the Medical College of Georgia.

机译:将物质的过去与计划的未来联系起来:佐治亚医学院的新图书馆增加了。

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Planning the addition to an existing health sciences library building involved problems not normally encountered in planning a totally new structure. Some of the problems in combining the old and new buildings of the Medical College of Georgia Library and their resolution are discussed in this paper. Emphasized in particular is the relationship between institutional goals, library goals, and the library building.
机译:计划对现有的健康科学图书馆大楼进行扩建时,会涉及计划全新结构时通常不会遇到的问题。本文讨论了佐治亚州医学院图书馆的新旧建筑及其解决方案中的一些问题。特别要强调的是机构目标,图书馆目标与图书馆建设之间的关系。

著录项

  • 期刊名称 The Aesculapian
  • 作者

    T G Basler; D H Mims; S J Smoot;

  • 作者单位
  • 年(卷),期 1983(71),4
  • 年度 1983
  • 页码 386–390
  • 总页数 5
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 16:30:45

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号