The main purpose is to put forward the requirements for each test items of the full inverter generator system. Such a test should be conducted during plant production and focus on the test equipment and applicable testing methods of function test of Low Voltage Ride Through. Since it is the first time to design such a test within workshop, the process is leading the pace in our country.% 主要对全逆变风电机组的厂内检测各项目提出要求,重点对厂内进行低电压穿越的检测提出设备要求和具体方法,这一方法是国内外最先提出的新方法。
展开▼