The cascade hydropower system composed of Pangduo reservoir and Zhikong reservoir are formed on the middlereach of the main Lasahe river. For giving full play of joint compensation effect of the two reservoirs, the paper studied the joint operationscheme for Pangduo reservoir and Zhikong reservoir. Based on the respective operation scheme, a reservoir group joint operationmodel is built, the model is solved by the simulation- optimization method, and then the practical and operational scheme isachieved. The scheme could give full play of the joint regulation and storage effect of the reservoir group and improve effectivelythe utilization factor of hydropower resources.
展开▼
机译:Closure to 'Influence of Daily Regulation of a Reservoir on Downstream Navigation' by Yizi Shang, Xiaofei Li, Xuerui Gao, Yanxiang Guo, Yuntao Ye, and Ling Shang
机译:Integrated Evaluation of Laminated Sand-Shale Gas-Bearing Reservoir Using Tensor Model. A Case Study Combining Data from Triaxial Resistivity, Image, Sonic, And Reservoir Testing in B-Field, Malaysia