The hydropower resources in Jinchuan - Danba Reach of Dadu River is planned to developed by three cascade stations of Aning, Badi and Danba after deeply research on development type, in which, the Anning and Badi hydropower projects will be dam -type developed and the Danba Hydropower Project will be mixed -type. The research on the development type of Jinchuan-Danba Reach show that the idea of reasonable development, adhere to both development and environmental protection, and people-centered scientific concept are fully reflected in the hydropower development of Dadu River.%通过水电开发方式研究与充分论证,大渡河金川至丹巴河段采用安宁+巴底+丹巴三级开发,其中安宁、巴底梯级采用坝式开发,丹巴梯级采用混合式开发.该河段水电开发方式研究工作充分体现了大渡河水电开发具有合理开发利用水能资源、坚持开发与环保并重、以人为本科学开发的水电开发理念.
展开▼