This article combines with the example of thin-wa-l ed high pier construction in Marin Bridge, analyzes the tower crane rol ing over construction process, and carries on the ap-plication research of key technologies such as the template en-gineering, turn up, measurement control, rebar connection, co-ncrete pumping and construction joint treatment control etc.%本文结合马林大桥薄壁空心高墩施工实例,解决了施工总体方案的选定问题,分析了塔吊翻模施工工艺,并对该工艺中的模板工程、翻升、测量控制、钢筋连接、混凝土土泵送以及施工缝处理等关键技术的控制进行了应用研究。
展开▼