This article takes the concrete cast-in-place pile co-nstruction in the Baili building projects of Houhai area Shen-zhen city as an example, analyzes and introduces the concrete cast-in-place pile construction technology under the complicat-ed geological conditions in reclamation area, and hope to pro-vide reference for similar engineering construction.%本文以深圳市后海片区百丽大厦项目混凝土灌注桩为例,分析并介绍了填海造陆地区复杂地质条件下的混凝土灌注桩技术,希望为类似工程施工提供参考。
展开▼