According to the actual situation of Beijing subway Fangshan Line project, this paper offers three independent systems: integrated supervisory and control system, power SCADA (supervisory control and data acquisition) system, electrical and mechanical supervisory system, then combines them into one model to reduce the cost and shorten the period of construction.%针对北京地铁房山线工程的实际情况,提出了一种能够使综合监控系统、电力监控系统、机电环境监控系统共用一套模型的方案,以节约工程成本,缩短工程周期.
展开▼