首页> 中文期刊>城市轨道交通研究 >昆明市轨道交通6号线新机场段方案研究

昆明市轨道交通6号线新机场段方案研究

     

摘要

城市轨道交通与机场的接驳是目前交通领域研究较多的课题.对昆明市轨道交通6号线(机场线)与昆明新机场接驳段的方案进行了研究分析.首先确定了6号线功能定位、车辆制式、编组方案等整个项目的技术前提,进而结合新机场的规划建设、与航站楼的换乘条件等确定了6号线在新机场段的路由、敷设方式和换乘模式,在此基础上,明确了6号线新机场段的敷设方案.通过对6号线新机场段敷设方案的分析,提供了研究城市轨道交通项目局部方案时确定前提条件和必要条件的思路和方法.%At present, the extension of urban rail transit line to airport has become a hot topic in transportation field. In this thesis, the connection scheme between Kunming Rail Transit Line 6 (the Airport Line) and the New Kunming Airport is studied. The technical premises, such as the functional orientation, vehicle type and marshalling scheme of Line 6 are firstly confirmed; then, the line route, track laying and transfer mode in the new airport are studied in combination with the planning and construction of the new airport and the transfer of the airport terminal! finally, the design scheme is determined. A general conclusion about the connection and transfer between rail transit and airport obtained which will offer beneficial references to similar projects.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号