首页> 中文期刊>城市地质 >地铁暗挖法施工中降水引起地面沉降问题的探讨

地铁暗挖法施工中降水引起地面沉降问题的探讨

     

摘要

近年来,地铁暗挖施工中辅助降水措施取得了很大成功,但由降水引起的地面沉降,其成因、危害性、如何避免和控制是十分重要的问题。本文结合北京地铁7号线双井站工程实际经验,对降水沉降问题进行探讨和总结。车站主体暗挖施工过程中,监测降水沉降值仅4.0mm,证明双井站降水方案和沉降控制措施是合理的。%In recent years, the assistant precipitation measures during the subway construction has achieved great success. However, the ground subsidence caused by precipitation, and how to avoid and control is a very important problem. In this paper, combined with the engineering practical experience of the Beijing Shuangjing Station on Line 7, the problems of dewatering and settlement are discussed and summarized. During the station excavation construction process, the precipitation sedimentation value is monitored to be only 4.0mm. This dewatering scheme has been proved effectively in Shuangjing Station settlement control measures.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号