Based on the covers structural characters and the technical requirements of the Circulating fluidized bed dry desulphurization absorption tower and the hoisting load of the existing machinery and tools, analyses the difficulties in the absorption tower erection and proposed a construction technology for the absorption that divided into several parts, combined in the ground and hoisted until being mounted.%根据循环流化床干法脱硫吸收塔结构特点、技术要求及现场机具吊装载荷要求,分析了吸收塔安装中的难点,提出了吸收塔分成几个部件在地面组合及吊装就位的全过程施工工艺。
展开▼