首页> 中文期刊> 《中国工程科学:英文版》 >Capping stack:An industry in the making

Capping stack:An industry in the making

         

摘要

This paper gives an overview of recent development of the marine well containment system (MWCS) after BP Macondo subsea well blowout occurred on April 20,2010 in the Gulf of Mexico. Capping stack,a hard-ware utilized to contain blowout well at or near the wellhead is the center piece of MWCS. Accessibility to the dedicated capping stacks is gradually becoming a pre-requirement to obtain the permit for offshore drilling/workover, and the industry for manufacturing,maintenance,transportation and operation of the capping stack is in the making.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号