In view of the drawbacks of traditional concrete curing methods, a large-tonnage box girder curing system is adopted in the construction of the Hanshi high-speed railway Gucheng beam-making yard, which realizes the all-round maintenance of box girder concrete and ensures the quality of the beam body. Practice has proved that the system has a high cost performance ratio, meets the requirements of high-speed railway for the maintenance quality of concrete beams, and improves the professional construction level of box girders. It has a wide application value.%汉十高铁谷城制梁场针对传统混凝土养护方法施工的弊端,采用了大吨位箱梁养护系统施工,实现了箱梁混凝土的全方位养护,确保了梁体的质量.实践证明,该系统性价比高,满足高速铁路对梁体混凝土养护质量的要求,使箱梁专业化施工水平又提高了一步,具有广泛的应用价值.
展开▼