The study has the systematic summary of the theoretic foundation for the application of SEW construction method in the shield end con- struction, undertakes the analysis of the reasons for the problems in the practice at No. 5 metro in Guangzhou, and points out the engineering solu- tion scheme, so as to provide the direction for the adoption of the method in future.%系统总结了SEW工法在盾构端头施工中应用的理论基础,结合广州地铁5号线实践中出现的问题进行成因分析,提出了工程解决方案,为今后采用该工法提供指导。
展开▼