以西安市三环灞河五跨下承式钢管混凝土系杆拱桥为研究对象,阐述了其施工工序及施工监控内容,通过对其进行施工监控,达到了较好的监控成果,保证了大桥的顺利建成。%Taking five span through concrete-filled steel tube tied-arch bridge in Xi’an city Sanhuan Bahe as the research object,this paper elaborated its construction processes and construction monitoring contents,through the construction monitoring,achieved a better monitoring results,ensured the successful completion of the bridge.
展开▼