Taking Changchun subway line No. 1 shielding construction engineering as an example,in light of its limited field conditions, the paper puts forward parallel separated station-crossing construction technology of shield machine,specifically introduces its technological procedures and implementation procedures,and finally guarantees smooth shield machine starting in the premise of guaranteeing safety,quality and construction duration.%以长春地铁1号线盾构施工工程为例,针对其场地条件受限的实际情况,提出了盾构机分体、平移过站的施工技术,并就该技术的流程、具体实施步骤等进行了详细介绍,在保障安全、质量和工期的前提下,保证了盾构机的顺利始发。