以南三龙铁路乾山隧道1号斜井施工为例,依据该工程场区的地质条件,提出了斜井进正洞挑顶施工中的支护加固措施,并对其施工工艺流程进行了阐述,总结了隧道施工过程中的注意事项,以期在保证施工质量与安全的前提下,加快施工进度。%Taking Qianshan tunnel No. 1 inclined shaft construction of Nansanlong railway as an example,according to the engineering field geol-ogy conditions,the paper puts forward picking peak bearing strengthening measures of the inclined shaft entering main tunnel,describes its con-struction technology procedures,and summarizes matters needing attention in tunnel construction process,so as to speed up the construction schedule in the premise of guaranteeing construction quality and safety.
展开▼