首页> 中文期刊> 《山东煤炭科技》 >大倾角综采工作面设备列车自移装置技术

大倾角综采工作面设备列车自移装置技术

         

摘要

For Xinjiang Coking Coal Group 2130 Coal Mine 25221 face the return airway roadway floor undulating, original mobile, fixed equipment, trains, you need to play set up the rail of the four monomer column in the equipment train front at the fixed equipment, trains, mobile need to use the eardstuek in the track and trains, mobile devices of the hydraulic cylinder of the diameter of 160ram and highly security incidents during the operation. By the theoretical analysis of the practical problems of the face, now installed in the equipment train front two self- shift car, and rely on self- shift car's own move to mobile devices train operation is simple, fast, safe and reliable.%该自移装置由两辆相同的自移车组成,每辆自移车上安装四个支柱和一节车厢,自移车固定设备列车方式为支柱支撑在顶板和底板上,随着巷道起伏的变化可调整支柱的长短;移动方式为自移。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号