针对伊新煤业锅炉房下方地基下沉,从采用黄土浆和水泥浆充填空洞区以控制沉降的角度出发,系统设计注浆充填工艺,保证了锅炉房使用安全,取得了显著的经济效益和社会效益。%In view of the beneath foundation of Yili Xinwen Mining Group Coal Industry boiler room sinking, this paper system designs of grouting process from the loess slurry and cement slurry iflling hole area in order to control the settlement and ensures the safe use of the boiler room, and has gained remarkable economic beneifts and social beneifts.
展开▼