首页> 中文期刊>铁道标准设计 >双控道岔联系电路的设计与实现

双控道岔联系电路的设计与实现

     

摘要

在个别站场间,为节省占地面积或受其他因素制约,两站的联锁区是由一组双动道岔隔开。若其中一站为计算机联锁控制,另一站为6502电气集中控制,依据相关设计规范,设计出一套计算机联锁车站与6502电气集中车站利用渡线隔开时的结合电路。该结合电路安全可靠,未改变原有电路定型结构。经过联锁模拟实验,该设计方案合理可行。%The interlocking area between certain two stations is isolated by a set of double acting switch due to the need to save land or other restrictions. If one station is of computer controlled interlocking, and another one is of 6502 electric centralized control, a combination circuit is designed to separate the station with computer controlled interlocking from the station with 6502 electric centralized control by the crossover. Such combination circuit is safe and reliable without alternating the original circuit. The interlocking simulation test proves that the design scheme is feasible.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号