高速铁路混凝土简支梁灾后换装恢复技术研究

         

摘要

分析了高速铁路混凝土简支梁换装恢复施工面临的问题,并提出了桥孔处支架现浇混凝土箱梁、梁场集中预制混凝土箱梁、桥孔平行侧低位台座和桥孔平行侧高位支架现浇混凝土箱梁4种新制混凝土箱梁的建造方案,以及重型高架台车平移换装、栈桥式平移换装和跨线龙门吊快速换装3种新制箱梁的换装技术方案。介绍了每种建造方案的优缺点,对比了不同的换装技术。对遭到损毁破坏的简支梁桥,先使用抢修钢梁保证其临时通车,再根据实际工况合理选择施工方案。通过换装作业,将新制的混凝土箱梁快速替换抢修钢梁,从而使灾后桥梁恢复原状并达到初始设计要求。%T he problems about replacement and recovery construction of high speed railway concrete simply-supported girder are analyzed. Four kinds of production scheme of concrete box girder including cast-in-situ box girder in the bridge opening bracket,concentration of precast concrete box girder in the girder yard,cast-in-situ concrete box girder in the low pedestal parallel and in the high support parallel to the side span,and three kinds of rapid recovery technology including heavy overhead trolley,trestle structure and gantry crane across the line are put forward. T he advantages and disadvantages of each method are introduced,and the different replacement technology are compared. T he damaged high speed railway bridges are replaced by emergency steel girder to ensure the temporary traffic. In order to choose reasonable construction scheme according to the actual working condition. T he original state and design requirements of the bridges are realized by using the new concrete box girders to replace the em ergency steel girders.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号