According to Metro protected areas in the design and construction of buildings subway excavation plane diagram ,to ensure the safety of subway construction ,it should be all‐round monitoring .In this paper ,taking the Nanjing Museum Phase II (South) project as an example ,it discusses the subway deformation monitoring of protected areas in the building construction methods .%根据地铁保护区中所建建筑物基坑设计与地铁平面关系图,为保证地铁结构的安全,应对其进行全方位监测。本文以南京博物院二期工程(南区)项目为例,探讨了地铁保护区中建筑物施工变形监测方法。
展开▼