首页> 中文期刊>武汉大学学报:自然科学英文版 >Safety Analysis for Thread Pair Clearance of Safety Mechanism of Three Gorges Project Ship Lift

Safety Analysis for Thread Pair Clearance of Safety Mechanism of Three Gorges Project Ship Lift

     

摘要

The Three Gorges Project(TGP) ship lift employs 4 safety mechanisms, of which one consists of a rotary locking screw and a nut jaw column. The thread pair clearance(TPC) of safety mechanisms is set at 60 mm. Owing to influential factors,the TPC changes randomly in the upward/downward-stroke of the ship chamber. If it diminished to 0, the safety mechanism would be jammed, thus resulting in disastrous accidents. By the bearing test of the drive system, 7 influential factors have been studied; 15 other influential factors(including 8 factors of manufacture and installation deviation, 3 factors of chamber offset, 2 factors of external load and 2 factors of wear) have been analyzed based on the design data. Results by the limit superposition reveal that the TPC change varies from -43.8 mm to +48.4 mm when the water level of the chamber ranges from 3.4 m to 3.6 m. According to the Gaussian distribution, the probability of the TPC change varied from -53.7 mm to +58.8 mm in the most detrimental status is99.74%, therefore, the TPC remains in a safe condition. This paper puts forward that two-phase operation of the drive system should be adopted so as to reduce the maximum TPC change to -44.6 mm.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号