近年来,我国各地超高层建筑发展迅猛,由此促进了我国建设工程领域尤其是超高层建筑方面各项技术的快速进步.基于青岛国际航运中心超高层建筑核心筒结构混凝土施工过程,探索分析液压爬模提升技术在该工程具体施工方法应用以及爬模支撑体系设计方法.%In recent years, high-rise buildings have been sprung rapidly in every province of our country.Thus, the construction of the kind promotes a rapidly progress in the construction engineering especially in super-tall building of various technique.This article based on a core tube structure in high-rise building of Qingdao International Shipping Central about concrete construction process explores and analyzes the hydraulic climbing form lifting technology's application in the engineering concrete construction method and the design method of climbing form supporting system.
展开▼