首页> 中文期刊> 《水利学报》 >两库联合排沙

两库联合排沙

         

摘要

在多沙河流的邻近河段上同时修建上、下两座水库,联合调节河流水沙.上库汛后拦蓄河流来水,至汛期泄空水库rn利用洪水冲淤,将蓄水期间淤积的泥沙排出水库;下库汛期调蓄来水,待蓄水用完,由上库供水进行冲刷排淤,再将淤在下rn库的泥沙排出水库,解决多沙河流单一水库排沙与蓄水调节径流的矛盾.两库淤沙与冲淤排沙达到平衡以后,虽然部分库容被rn淤,但是保留下来的有效库容能够长期调水调沙.%This paper presents a scenario in which two reservoirs in cascade are jointly used tornregulate water and silt. The upstream reservoir retains water during post flood period andrndischarges water in flood season. Thus, it makes use of flood to sluice sediment during floodrnperiod. At the same time the downstream reservoir regulates the incoming water during floodrnperiod. After the retained water is used up, the downstream reservoir uses water from upstreamrnreservoir to sluice sediment. This mode of operation can coordinate sediment sluicing and waterrnretaining. After the balance of sediment depositing and sluicing is achieved, the effectivernreservoir volumes can regulate both water and silt for a long term.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号