首页> 中文期刊> 《安阳工学院学报》 >澳门轻轨高架桥节段箱梁施工控制研究

澳门轻轨高架桥节段箱梁施工控制研究

         

摘要

Construction control of segmental box girder of Macau light railway viaducts was studied. Taking Ma⁃cau light railway viaduct as an instance, detailed monitoring scheme was planned. Construction control ideas were described also. Monitoring at all stages has been carefully completed, with being focused on the geometry control and stress control during the installation of segmental box girder, which could provide experience for simi⁃lar projects construction.%研究了澳门轻轨高架桥节段箱梁施工控制。以澳门轻轨高架桥为工程背景,制定详细的监控方案,阐述施工控制思路,施工控制流程和施工控制内容,认真完成了准备阶段、预制阶段和安装阶段各个阶段的监控,着重研究了节段箱梁段安装过程中的线形控制和应力控制,对今后类似工程的施工控制有参考价值。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号