首页> 中文期刊> 《江西煤炭科技》 >分段“Z”型留巷和跳压反采过断层在百善矿的实践

分段“Z”型留巷和跳压反采过断层在百善矿的实践

         

摘要

There are two ways of crossing faults in blasting face:one is horizontal advance and forced cross by ripping and floor damage in low -drop fault and another is direct finishing after stoping to the fault ,resettling working face at step-pressure cut laid in advance and stoping forward passing through fault .Aiming at the dis‐advantages of the two above-mentioned methods ,the author present the method of crossing fault by Z -type retaining roadway and step-pressure stoping ,which has been put into use at working face of 68 -Nanyi coal pillar with great economic benefits .%炮采工作面过断层大致有两种方法:一是断层落差较小时进行平推硬过,即是采取挑顶破底,平推硬过;二是断层落差较大时进行跳压回采,即是提前做好跳压切眼,回采至断层处后直接收作,在跳压切眼重新安装工作面,跳过断层继续向前回采。上述两种方法都存在一定的弊端,现提出分段“Z”型留巷和跳压反采的回采方式,对该方式进行了系统分析,投入到68南翼煤柱工作面中应用,并取得了明显的经济效益。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号